The ABCXYZ book and the hive and the honeybee books both have floor plans of differant size operations. Her in Michigan we have goverment requirements. Running hot water (if a well it has to be sampled), Large enough septic or sanitary, Sink, Concrete floor with drains, Break proof lighting and a Bathroom available